UPSI Digital Repository (UDRep)
Start | FAQ | About

QR Code Link :

Type :article
Subject :HD Industries. Land use. Labor
Main Author :Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
Title :Fragmentation issue in Malaysian Industrialised Building System (IBS) projects (IR)
Year of Publication :2014
PDF Full Text :Login required to access this item.

Abstract :
As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialised Building System (IBS), as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach. This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a number of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded.
This material may be protected under Copyright Act which governs the making of photocopies or reproductions of copyrighted materials.
You may use the digitized material for private study, scholarship, or research.

Back to previous page

Installed and configured by Bahagian Automasi, Perpustakaan Tuanku Bainun, Universiti Pendidikan Sultan Idris
If you have enquiries with this repository, kindly contact us at pustakasys@upsi.edu.my or Whatsapp +60163630263 (Office hours only)